How a 50-store retail network controls its opening CAPEX

Specialized distribution group with a sustained store opening and renovation program: 6 to 10 openings or renovations per year. Each store project is a standalone CAPEX — construction, fitting, equip…

−42% budget overruns on store openings
−65% CAPEX consolidation workload for CFO
×3 faster cross-department approval cycle
0 unanticipated overrun on 14 post-deployment openings

Specialized distribution group with a sustained store opening and renovation program: 6 to 10 openings or renovations per year. Each store project is a standalone CAPEX — construction, fitting, equipment, IT — managed by a central works department but funded by regional budgets.

The challenges before CAPEXIA

Scattered approvals Each store opening mobilizes 4 to 6 internal stakeholders (works, IT, retail ops, regional finance) with approvals scattered across emails, Teams and briefing meetings.
Overruns discovered too late Construction budget overruns are systematically discovered during the project, never anticipated. Finance has no warning signal before the final invoice.
Disconnected IT and works budgets IT commits equipment (POS, kiosks, network) on its own budget without formal coordination with the store works budget. The two budgets do not communicate.
Costly monthly reporting The monthly CAPEX openings report presented to CODIR takes 4 days of consolidation by the CFO — for a result nobody really challenges as nobody has a reliable comparison basis.

CAPEXIA was configured with a store project template grouping 4 budgets (works, fitting, IT, misc) in a single file per opening.

The approval workflow sequentially involves the works director, regional CFO and group CFO above €150K. Each in-progress overrun automatically triggers an alert and a formalized budget revision request — which must be approved before additional works can be committed.

−42% budget overruns on store openings
−65% CAPEX consolidation workload for CFO
×3 faster cross-department approval cycle
0 unanticipated overrun on 14 post-deployment openings
We used to discover construction overruns at handover. CAPEXIA forced us to formalize budget revisions during the project — it changed the relationship with our contractors.
— CFO · specialized distribution group

Your organization deserves the same rigor.

In 45 minutes, we show you how CAPEXIA adapts to your structure, your ERP, and your delegation thresholds.